Drive STINGRAY Operator's Manual Page 27

  • Download
  • Add to my manuals
  • Print
  • Page
    / 58
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 26
Laser Operation
2 - 7
Installing a
Mounting
Bracket
It is important to use a mounting bracket that is specifically designed
to handle the heat dissipation requirements of our lasers, especially
for those operating above 20 mW. Coherent StingRay lasers contain
a built-in temperature monitoring circuit. Should the laser become
too hot, the unit is designed to temporarily shut down. Full laser
operation will only resume once the laser returns to normal oper-
ating temperatures and power is cycled.
If you would like to have a mounting bracket (P/N 1222896) shipped
with your laser, make sure to mention it at the time you place the
order. The standard mounting bracket has 4 thru-holes or M3
metric-threaded holes from the bottom for easy mounting. Once
attached to the assembly, slide the laser (front end first) into the
mount. Position the laser so there is full accessibility to the focusing
element. Tighten the clamp on the laser mount.
NOTICE!
Always ensure that any support on which the laser is mounted is
not made of insulating material, and that the heat of the laser
can be properly transferred.
Figure 2-4. Standard Coherent StingRay with Mounting Bracket
Mounting
Area
.61 in.
[15.49 mm]
.57 in.
[14.36 mm]
1.24 in.
[31.37 mm]
R .47 in.
[11.94 mm]
R .380 in.
[9.652 mm]
THRU
Page view 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 57 58

Comments to this Manuals

No comments